Agiru Centre Power System Upgrade – Urban Electrification

Project

Agiru Centre Power System Upgrade – Urban Electrification

Location

Mendi, Souther Highlands Province

Year completed

2023

Client

SHPG

Contract

Operations & Maintenance

Project value

K1.5 million
  • Comprehensive Audit
  • Tailored Solution Design
  • Procurement Planning
  • Installation Inspection and Monitoring
  • Efficiency & Reliability Assessment
  • Handover Sign-Off

As part of the power system upgrade, a new “smart” 250KVA XCMG standby genset with Cummins engine was installed, replacing the old 150KVA unit. The power system overhaul included replacement of genset, replacement of Automatic Transfer Switch (ATS), replacement of new cabling, pipework, and controls. The new 250KVA unit come together with base thank with 8hours continuous running capacity, as well as inbuild protection system. The project was completed and delivered on 2023.